Plumbing Rough-In: What Happens Before the Walls Close
When you look at a finished kitchen or bathroom — a clean island sink, a walk-in shower, a double vanity — what you see is the last 10% of the plumbing. The other 90% was decided weeks earlier, while the walls were still open. That stage is called the rough-in, and it is the one stage you cannot fix cheaply afterwards.
In a recent basement finishing and kitchen project of ours, the rough-in started below the floor. The new basement bathroom and laundry needed drains where none existed, so a section of the concrete slab was cut open, the underground drain lines were laid with the right slope, and the floor was patched back with gravel and concrete. Once that concrete sets, moving a toilet or a shower drain means cutting the floor open again — so the layout has to be exactly right before a single pipe is buried.

Then comes the work inside the walls: water supply lines run to every fixture, drain and vent pipes rise through the framing, and each fixture gets its own vent to the roof so drains flow quietly and traps don't siphon dry. On this project you can see the black ABS drain stack and the laundry tub connection going in while the framing was still bare — the moment when every measurement is still visible and checkable.

Three things we tell every homeowner before the walls close:
1. Decide fixture locations now, not later. A toilet moved 6 inches after the tile is down is a demolition job; moved during rough-in, it is a one-hour change. If you are still choosing between a single and a double vanity, or a tub versus a walk-in shower, decide before the rough-in inspection.
2. Ask for a pressure test and an inspection. Supply lines should be pressure-tested before drywall, and in Ontario the rough-in must be inspected before the walls close. If your contractor wants to board over pipes without an inspection, stop the job and ask why.
3. Think about access. Shut-off valves for every fixture, an accessible cleanout, and a laundry tub drain that is easy to reach will save you real money years from now. The cheapest time to add a shut-off is while the wall is open.
Once the rough-in passes inspection, the walls close and the work disappears — until the day you turn on the tap. Done right, you will never think about it again. Done wrong, you will think about it every day.
That is why we photograph the rough-in on every job and walk the homeowner through it before the drywall goes up. What is hidden should be the most carefully done part of the house, not the least.
Planning a bathroom, kitchen, or basement finishing? We will come to your home, look at the space in person, and give you a free estimate. Call (647) 219-6335 or visit www.impexconstruction.com.