top of page
Renovation Tips


Plumbing Rough-In: What Happens Before the Walls Close
When you look at a finished kitchen or bathroom — a clean island sink, a walk-in shower, a double vanity — what you see is the last 10% of the plumbing. The other 90% was decided weeks earlier, while the walls were still open. That stage is called the rough-in, and it is the one stage you cannot fix cheaply afterwards. In a recent basement finishing and kitchen project of ours, the rough-in started below the floor. The new basement bathroom and laundry needed drains where non
saseddighpour
13 hours ago2 min read


Basement Framing: Reading the Layout and Boxing In Ducts the Right Way
A finished basement starts long before the drywall goes up. Framing is the skeleton of the whole project — every wall, doorway, bulkhead and ceiling line is decided at this stage, and a mistake here follows you through plumbing, electrical, drywall and trim. Here is how we approach framing on our basement projects in the GTA. 1. Read the layout before a single stud goes up A basement is never a blank rectangle. There are posts, beams, ductwork, plumbing stacks and a furnace t
saseddighpour
1 day ago2 min read


Drywall & Taping: The 3-Coat System Behind Smooth Walls
If you have ever run your hand along a freshly painted wall and felt a ridge, a bubble, or a seam you could see in daylight, you already know the truth about drywall: the boards are only half the job. The smooth finish comes from taping and mudding — and, more specifically, from a three-coat system that gives each layer a clear job to do. At Impex Construction, we use that system on basement finishing and renovation work across the Greater Toronto Area, because shortcuts at t
saseddighpour
3 days ago2 min read
bottom of page
